Framework:CoPlanner cube designer: Difference between revisions
No edit summary |
No edit summary |
||
| Line 8: | Line 8: | ||
[[image:Fw_BI_Center creating a new CoPlanner cube.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center creating a new CoPlanner cube.jpg|thumb|center|Framework, BI Center, creating a new CoPlanner cube]] | ||
The dialog “CoPlanner cube” is displayed. | The dialog “CoPlanner cube” is displayed. | ||
[[image:Fw_BI_Center name of the CoPlanner cube.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center name of the CoPlanner cube.jpg|thumb|center|Framework, BI Center, name of the CoPlanner cube]] | ||
{| {{Bausteindesign2}} | {| {{Bausteindesign2}} | ||
| Line 21: | Line 21: | ||
The new CoPlanner cube object “;My P&L” is created and the CoPlanner cube designer is opened. The following screen is presented. | The new CoPlanner cube object “;My P&L” is created and the CoPlanner cube designer is opened. The following screen is presented. | ||
[[image:Fw_BI_Center CoPlanner cube designer.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center CoPlanner cube designer.jpg|thumb|center|Framework, BI Center, CoPlanner cube designer]] | ||
The CoPlanner cube designer contains four tabs. | The CoPlanner cube designer contains four tabs. | ||
| Line 64: | Line 64: | ||
You can change the width of the tree by clicking on the right edge with the left mouse button. With the button held down, make the area bigger or smaller. | You can change the width of the tree by clicking on the right edge with the left mouse button. With the button held down, make the area bigger or smaller. | ||
[[image:Fw_BI_Center changing the width of the object tree.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center changing the width of the object tree.jpg|thumb|center|Framework, BI Center, changing the width of the object tree]] | ||
{| {{Bausteindesign2}} | {| {{Bausteindesign2}} | ||
| Line 71: | Line 71: | ||
|} | |} | ||
[[image:Fw_BI_Center Structure and object selection .jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center Structure and object selection .jpg|thumb|center|Framework, BI Center, Structure and object selection ]] | ||
====Properties in the “Data sources” tab==== | ====Properties in the “Data sources” tab==== | ||
| Line 77: | Line 77: | ||
In the right part of the Designer, the properties of the data objects are shown. | In the right part of the Designer, the properties of the data objects are shown. | ||
[[image:Fw_BI_Center property of the data object.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center property of the data object.jpg|thumb|center|Framework, BI Center, property of the data object]] | ||
'''Alias''' | '''Alias''' | ||
| Line 132: | Line 132: | ||
The “Dimensions” tab shows all dimensions assigned to the data objects, whereas identical dimensions contained in the data objects are connected and assigned. Assigned dimensions are indicated with a green check [[Image:Icon_Haekchen.jpg]], non-assigned dimensions or dimensions that cannot be assigned are shown on a grey background. | The “Dimensions” tab shows all dimensions assigned to the data objects, whereas identical dimensions contained in the data objects are connected and assigned. Assigned dimensions are indicated with a green check [[Image:Icon_Haekchen.jpg]], non-assigned dimensions or dimensions that cannot be assigned are shown on a grey background. | ||
[[image:Fw_BI_Center Dimensions tab.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center Dimensions tab.jpg|thumb|center|Framework, BI Center, Dimensions tab]] | ||
You can break an assignment [[Image:Icon_Haekchen.jpg]] of the dimension by clicking on the corresponding element. In the same manner, you can also re-establish an assignment. | You can break an assignment [[Image:Icon_Haekchen.jpg]] of the dimension by clicking on the corresponding element. In the same manner, you can also re-establish an assignment. | ||
| Line 144: | Line 144: | ||
The following screen is presented. | The following screen is presented. | ||
[[image:Fw_BI_Center Adding a subset.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center Adding a subset.jpg|thumb|center|Framework, BI Center, Adding a subset]] | ||
For both data objects, the assignment is shown on a grey background. | For both data objects, the assignment is shown on a grey background. | ||
| Line 155: | Line 155: | ||
A dialog to select the subset opens. Only the possible assignments are shown in black. | A dialog to select the subset opens. Only the possible assignments are shown in black. | ||
[[image:Fw_BI_Center possible assignments.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center possible assignments.jpg|thumb|center|Framework, BI Center, possible assignments]] | ||
{| {{Bausteindesign2}} | {| {{Bausteindesign2}} | ||
| Line 164: | Line 164: | ||
In the corresponding element, the “Manually assigned” [[Image:Icon_manuell_zugeordnet.jpg]] icon is displayed. This data object is now linked with this subset. | In the corresponding element, the “Manually assigned” [[Image:Icon_manuell_zugeordnet.jpg]] icon is displayed. This data object is now linked with this subset. | ||
[[image:Fw_BI_Center manually assigned subset.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center manually assigned subset.jpg|thumb|center|Framework, BI Center, manually assigned subset]] | ||
The dimension “P&L structure” is not required any more and deleted. | The dimension “P&L structure” is not required any more and deleted. | ||
| Line 175: | Line 175: | ||
You will see the following screen: | You will see the following screen: | ||
[[image:Fw_BI_Center dimensions.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center dimensions.jpg|thumb|center|Framework, BI Center, dimensions]] | ||
====Properties in the “Dimensions” tab==== | ====Properties in the “Dimensions” tab==== | ||
| Line 219: | Line 219: | ||
The following screen shows up: | The following screen shows up: | ||
[[image:Fw_BI_Center Measure tab.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center Measure tab.jpg|thumb|center|Framework, BI Center, “Measure” tab]] | ||
{| {{Bausteindesign2}} | {| {{Bausteindesign2}} | ||
| Line 226: | Line 226: | ||
|} | |} | ||
[[image:Fw_BI_Center properties of a measure.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center properties of a measure.jpg|thumb|center|Framework, BI Center, properties of a measure]] | ||
{| {{Bausteindesign2}} | {| {{Bausteindesign2}} | ||
| Line 241: | Line 241: | ||
|} | |} | ||
[[image:Fw_BI_Center Properties of a measure cumulated.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center Properties of a measure cumulated.jpg|thumb|center|Framework, BI Center, Properties of a measure, cumulated]] | ||
====Properties in the “Measure” tab==== | ====Properties in the “Measure” tab==== | ||
| Line 350: | Line 350: | ||
You are shown the following screen: | You are shown the following screen: | ||
[[image:Fw_BI_Center creating a calculated measure.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center creating a calculated measure.jpg|thumb|center|Framework, BI Center, creating a calculated measure]] | ||
The second calculated measure should show this variance in percent. | The second calculated measure should show this variance in percent. | ||
| Line 371: | Line 371: | ||
|} | |} | ||
[[image:Fw_BI_Center creating a calculated measure in percent.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center creating a calculated measure in percent.jpg|thumb|center|Framework, BI Center, creating the calculated measure “in percent”]] | ||
To establish the variance, both absolute and in percent for the cumulated values, proceed exactly as explained in the previous steps. As a result, you get the following appearance. | To establish the variance, both absolute and in percent for the cumulated values, proceed exactly as explained in the previous steps. As a result, you get the following appearance. | ||
| Line 405: | Line 405: | ||
In this tab, the result of the CoPlanner cube is displayed. In the tree on the left, the available dimensions and measures are displayed. They can be added to the analysis as a filter or measure by dragging and dropping or with a mouse click. The right part shows general properties of the analysis. | In this tab, the result of the CoPlanner cube is displayed. In the tree on the left, the available dimensions and measures are displayed. They can be added to the analysis as a filter or measure by dragging and dropping or with a mouse click. The right part shows general properties of the analysis. | ||
[[image:Fw_BI_Center Preview tab.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center Preview tab.jpg|thumb|center|Framework, BI Center, “Preview” tab]] | ||
| Line 420: | Line 420: | ||
|} | |} | ||
[[image:Fw_BI_Center Preview tab, select measure.jpg|thumb|center|Framework, BI | [[image:Fw_BI_Center Preview tab, select measure.jpg|thumb|center|Framework, BI Center, “Preview” tab, select measure]] | ||
Revision as of 10:12, 19 July 2010
In this example, a user-defined profit and loss account is created as a CoPlanner cube according to the aggregate cost method. Apart from the representation of plan and actual values, the variance is to be calculated as an absolute value and in percent.
| Entry Click on the “My objects” directory with the right mouse button. From the “New” context menu, select the command “CoPlanner cube” |

The dialog “CoPlanner cube” is displayed.

| Entry Enter the name of the new CoPlanner cube, “My P&L”, and confirm by clicking OK. |
The new CoPlanner cube object “;My P&L” is created and the CoPlanner cube designer is opened. The following screen is presented.

The CoPlanner cube designer contains four tabs.
- Data sources
- Dimensions
- Measures
- Preview
Ribbon
The icons in the toolbar have the following functions:

| Button | Action |
| Save | |
| Save as
Not in use | |
| Reload connectors
During a session, changes in the OLAP database are only reloaded from the server after a click on this button. | |
| Search
Search in the object tree |
“Data sources“ tab
In this tab, the data basis is defined. The available data objects are shown in the left tree of the designer. These are arranged by CoPlanner tables, CoPlanner cubes and OLAP cubes. You can change the width of the tree by clicking on the right edge with the left mouse button. With the button held down, make the area bigger or smaller.

| Entry As the data basis, choose the CoPlanner tables and “P&L_aggregate cost method_PLAN” and “P&L_ aggregate cost method_ACTUAL”. Using drag & drop, drag these tables to the working area. |

Properties in the “Data sources” tab
In the right part of the Designer, the properties of the data objects are shown.

Alias
This text is shown.
IsPlanDependent
Provides information whether the data object is plan dependant, i.e. whether the data acquired by the user are written to the plan selected at login, or whether this characteristic is not relevant (actual data).
Special
CUSTOMROLLUP=LASTMONTHONYEAR;
Overrides the annual value in the time dimension and instead shows the value of the last month of the year.
CUSTOMROLLUP=FIRSTMONTHONYEAR;
Overrides the annual value in the time dimension and instead shows the value of the first month of the year.
CUSTOMROLLUP=LASTNONEMPTYMONTHONYEAR;
Overrides the annual value in the time dimension and instead shows the value of the last non-empty month of the year.
CUSTOMROLLUP=LASTCHILDONPARENT;
Overrides the value of nodes on the time axis (or a time subset) and instead shows the value of the last leaf element.
| Hint Is applied when time subsets are used. |
CUSTOMROLLUP=FIRSTCHILDONPARENT;
Overrides the value of nodes on the time axis (or a time subset) and instead shows the value of the first leaf element.
| Hint Is applied when time subsets are used. |
| Entry Give the table “P&L_aggregate cost method_PLAN” the alias “P&L plan” and give the table “P&L_ aggregate cost method_ACTUAL” the alias “P&L actual”.
Activate the “Dimensions” tab. |
“Dimensions” tab
The “Dimensions” tab shows all dimensions assigned to the data objects, whereas identical dimensions contained in the data objects are connected and assigned. Assigned dimensions are indicated with a green check
, non-assigned dimensions or dimensions that cannot be assigned are shown on a grey background.

You can break an assignment
of the dimension by clicking on the corresponding element. In the same manner, you can also re-establish an assignment.
To delete a dimension, all assignments must be broken first. Then the “Delete” button
will show up next to the dimension, and the dimension can be removed.
| Entry Choose the “Sub_P&LACM” subset from the “Dimensions” tree. |
The following screen is presented.

For both data objects, the assignment is shown on a grey background.
| Entry Click the black arrow in the grey element. |
A dialog to select the subset opens. Only the possible assignments are shown in black.

| Entry Select the entry Sub_P&LACM for both elements. |
In the corresponding element, the “Manually assigned”
icon is displayed. This data object is now linked with this subset.

The dimension “P&L structure” is not required any more and deleted.
| Entry In the data objects, click on the elements “P&L structure” and break the assignment. Then the dimension can be deleted. |
You will see the following screen:

Properties in the “Dimensions” tab
In the right part of the designer, the properties of the dimensions are shown.
Alias
This text is shown.
IsPlan
Provides information whether the dimension is the CoPlanner system dimension “Plan”. If the dimension is the plan dimension, it can only be applied to data objects if “IsPlanDependent”, has been set as the property of the data source.
| Entry Activate the “Measure” tab. |
“Measure” tab
In the “Measure” tab, you define which measures are shown.
| Hint Please note that a measure cannot have the same denomination as a dimension |
Here you also set the number format. This will be used for all later analyses.
Another possibility in this step is the display of cumulated values.
In this example, the values of the individual periods and the cumulated value are to be shown.
| Entry At first drag the “Value” element of the “P&L Plan” data object to the working area, and then the “Value” element of the “P&L Actual” data object.
Repeat this procedure. |
The following screen shows up:

| Entry Highlight the first entry and under the property “alias” allocate the name “Plan value”. Enter “n2” under the “Number format” property for an integer with 2 decimal places. |

| Entry Activate the second measure, “Value_1”, and allocate the alias “Actual value”, giving it the number format “n2”. |
The measures “Value_2” and “Value_3” should now show the cumulated plan respectively the actual value.
| Entry Activate the third measure, “Value_2”, and allocate the alias “Plan value cum“, giving it the number format “n2”. Now from the list of the property “CumSettingType”, choose the entry “Fiscal year”, and from the list of the property “CumSettingColumn” choose the entry “Time”.
The fourth element, “Value_3”, receives the alias “Actual value cum” and the same settings as the previous element. |

Properties in the “Measure” tab
In the right part of the designer, the properties of the measures are shown.
AggregationsType
Specifies how subordinated elements are aggregated (projected) in the sum element above.
SUM: Subelements are added AVG: Subelements are averaged
Alias
This text is shown.
CalcBackExpression
As the name suggests, this special setting permits “back calculation”, for instance
calcback[MeasureTarget]=[Measure1]*[Measure2];
In the example quantity x price=turnover, let the quantity and the price be database fields and the turnover a calculated field. In order to determine the necessary quantity by entering a value in the ‘Turnover’ field, the following formula is used:
calcback [Quantity]=[Turnover]/[Price];
Quantity is the field whose value is changed – the formula after the “=” character provides the calculation of the new quantity. As it is always advisable, in the case of divisions, to prevent a division by 0, it is recommended to extend the expression as follows:
calcback [Quantity]=IIF([Price]=0,[ Quantity],[Turnover]/[Price]);
This now prevents a change of the ‘Quantity’ field if the ‘Price’ field is still 0 when a turnover is entered. Rewriting into several fields simultaneously is also supported – various CalcBack instructions are simply separated with semi-colons.
| Hint If a table and a writable column are additionally selected, this field will be written simultaneously as well. |
Formulae in CalcBack expressions are to be defined like in the ‘Expression’ field (see below).
Expression
If the measure is calculated via a formula, it is shown here.
NumberFormat
Definition of the number format. The following are allowed:
- for integers: n0…n2, #.##0.00, etc.
- percentages: p0…p2, 00.00%, etc.
ReadOnly
Defines whether this column is to be write-protected.
CumSettingType
Setting of the cumulation. The following possibilities are available for selection:
- CalendarYear
- FiscalYear
- Ongoing
- Month
- Quarter
- Week
CumSettingColumn
CumSettingColumn offers the dimensions of the data source for selection over which a cumulation is to be performed.
ShiftCol
This offers the dimensions of the data source to which a time shift can be applied.
Shift_Interval
Number of periods that are to be shifted. A forward and backward time shift is possible and defined by using the (+/-)sign.
TimeDimType
Days/Calendar week/Month/Quarter/Year – defines the type of the period that is to be shifted.
| Entry Activate the “Calculated measure” tab |
“Calculated measure”
You can create any number of “Calculated measures” and establish their calculation very easily with formula wizards. In the left tree there is the button to add new calculated measures. On the right, the properties of the calculated measures are shown. In this example, the variance between plan and actual values is calculated as an absolute figure and in percent, in each case for the individual periods as well as the cumulated values.
| Entry Create a new measure by pulling the “Add” button to the working area. |
A measure is created. Open the formula editor by clicking the “Process formula” button. Simply use drag & drop to pull the desired measure to the formula wizard. All four basic arithmetical operations are permitted as calculations. Furthermore, the functions of the CoPlanner business economics formulae (FCT_TimeDimAdd, FCT_GetRecord, etc.) are available.
| Entry Highlight the first measure and allocate the alias “Variance”. As the number format, enter “n2” under the property “Number format”.
Then at first use drag & drop to pull the “Plan value” measure to the formula wizard. Then write a “-“ sign and finally pull the “Actual value” measure to the formula wizard. |
You are shown the following screen:

The second calculated measure should show this variance in percent.
| Entry Create a new measure and allocate the alias “in percent”. As the number format, enter “p2” under the property “Number format”. |
| Hint The formula wizard supports the use of previously created calculated measures. |
| Entry Enter “[Variance]” in the formula wizard and then the symbol for division, “/”. Complete the formula by dragging & dropping the measure “Plan value” from the tree to the formula wizard. Finally multiply this formula by 100. |

To establish the variance, both absolute and in percent for the cumulated values, proceed exactly as explained in the previous steps. As a result, you get the following appearance.
Properties for “Calculated measures”
In the right part of the designer, the properties of the calculated measures are displayed.
Alias
This text is displayed.
CalcBackExpression
See above.
Expression
Write-protected, shows the result of the formula wizards.
Numberformat
Entry of the number format
| Entry Activate the “Preview” tab. |
“Preview” tab
In this tab, the result of the CoPlanner cube is displayed. In the tree on the left, the available dimensions and measures are displayed. They can be added to the analysis as a filter or measure by dragging and dropping or with a mouse click. The right part shows general properties of the analysis.

| Hint If you activate the “preview” tab, all adjustments performed up to this point will be saved. |
